Adıyaman Flotation Plant Automation

  • Customer:Eti Bakır
  • Category:Process
  • Date:8 August, 2019
  • Status:Commissioned
  • Application:Mining
  • Control System:ABB 800xA DCS
  • Size:3 Red. Controller & 2.150 I/O

Proje Detayı

The project includes the automation of Eti Bakır's flotation facility in Adıyaman. Automation system was built as ABB’ 800xA DCS on a turnkey basis.