The project scopes the control and automation of OYKA Energy's 24 MW cogeneration plant in Çaycuma. The turbines are from GE and BoP automation has done with ABB’s Freelance DCS system. The controllers are redundant and also the PROFIBUS
The automation of the software, hardware and panels of the DCS Control system was made on a turnkey basis. ABB Freelance redundant DCS and S800 I / O hardware and software are used as the control system.

